OC and CC full form and meaning: how to check them for a Mumbai flat
What the Occupation Certificate and Commencement Certificate mean in Mumbai, what “OC received”, “full CC” and “plinth CC” mean in a listing, how to check CCs on MahaRERA, and your rights under the RERA Act.
By Ashwin · Updated · Not legal advice
The two certificates
| CC | OC | |
|---|---|---|
| Full form | Commencement Certificate | Occupation (or occupancy) Certificate |
| What it allows | Building work, up to the floors it names | Living in the building, or the part it names |
| When | Before work starts, then again as floors are added | After the building is finished and inspected |
| Who issues it | The planning authority: in Mumbai, usually the BMC; for slum schemes, the SRA | The same authority |
| Where to see it | MahaRERA project page | Ask the builder or society for a copy |
The RERA Act defines an occupancy certificate as the certificate permitting occupation of a building under local laws, which has provision for water, sanitation and electricity (section 2(zf)).
1Check the CC on a new project
A project can sell flats on floors its permit doesn’t yet cover. That is normal early on, but a permit that stays at the basement for a long time is a question to ask.
- Time
- 5 min
- Cost
- Free
How to check
- Open the project on MahaRERA (how to find it).
- Find Commencement Certificate / NA Order Documents Details. Each row is a CC, with its date and the document.
- Check the column Is CC One Year Old, and look for a later CC or renewal if it says yes.
- On newer pages, the building table’s CC Issued up-to (No. of Floors) shows how far the permits reach. Compare it with the sanctioned floors and with your floor.
Watch out for
- A CC that names only the plinth or basement, with no later one, on a project selling upper floors.
- A last CC more than a year old, with no renewal on record.
- A sales team that can’t tell you which CC covers your floor.
2Check the OC before possession
Without an OC, the building isn’t cleared to live in. With a part OC, only the wings or floors it names are.
- Time
- 10 min
- Cost
- Free
- Where
- Builder, or the society for a resale flat
How to check
- Ask for a copy of the OC before you take possession, or before you pay for a resale flat.
- Check who issued it and when: it should come from the planning authority, not the builder.
- Check it names your building and wing, and that it covers your floor. A part OC lists what it covers.
- Note the date: from it, you have two months to take possession (RERA Act, section 19(10)).
Watch out for
- Possession offered with the OC “applied for” but not issued.
- A part OC that covers other floors or wings, but not yours.
- For a resale flat, a building that never received an OC. Ask a property lawyer before you go ahead.
What we found
Building permits, from our reports. Each was read on MahaRERA or in the permit itself.
| Project | Building permit (CC) |
|---|---|
| Godrej Nurture | Ran to Jun 2025. Plinth-level CC; no later CC on MahaRERA as of 30 Sep 2026 |
| Raheja Antares | To the basement. BMC’s CC, last endorsed Apr 2025; none later on MahaRERA as of 30 Sep 2026 |
| Runwal Meadows | To the basement slab. BMC’s CC of 6 Mar 2026, valid to 5 Mar 2027 |
| Lodha Corinthia | Valid to 12 Sep 2026. No renewal on MahaRERA as of 29 Sep 2026 |
A permit that hasn’t moved isn’t proof of a problem, but it is a question for the builder before you pay.
Quick answers
What is the full form of OC and CC?
OC is the Occupation Certificate (the RERA Act calls it an occupancy certificate). In Mumbai, CC is the Commencement Certificate. Elsewhere CC can mean completion certificate, so ask which one is meant.
What does “OC received” mean in a flat listing?
That the planning authority (in Mumbai, usually the BMC, or the SRA for slum schemes) has issued the building its Occupation Certificate, so it is cleared to live in. Ask for a copy and check it covers your wing and floor: a part OC covers only what it names.
What does “full CC received” mean?
That the building’s commencement certificates now cover all its sanctioned floors, not just the first few. Check it on the project’s MahaRERA page, where newer pages show CC Issued up-to (No. of Floors) for each building.
What is a plinth CC?
A commencement certificate that allows work only up to the plinth, the base the building stands on. Further CCs follow as the floors go up. A project selling upper floors on a plinth CC alone for a long time is a question for the builder.
What does “CC Issued up-to (No. of Floors)” mean on MahaRERA?
It is the column in a project’s building table showing how many floors its CCs cover so far. Compare it with the sanctioned floors and with your floor.
Can I take possession without an OC?
The builder must get the OC and give it to buyers (RERA Act, section 11(4)(b)). Possession offered with the OC only “applied for” is a warning sign; ask a property lawyer before you move in.
The checklist
| Check | Where | Time |
|---|---|---|
| Which CC covers your floor | MahaRERA project page | 5 min |
| Latest CC under a year old, or renewed | MahaRERA project page | 2 min |
| A copy of the OC | Builder or society | — |
| OC covers your wing and floor | The OC | 5 min |
| Possession within two months of the OC | Your calendar | — |
See it for a project
Our reports read every permit on record for a project and say how far it reaches. Each project’s preview is free.
More checks before you pay: what to check before the token.
Sources
- The Real Estate (Regulation and Development) Act, 2016: sections 2(zf), 11(4)(b) and 19(10).
- MahaRERA project pages, maharera.maharashtra.gov.in, used 8 Oct 2026.
- Permit findings: our reports, from MahaRERA filings and the permits on record.