Area guide · Mumbai
Buying a flat in Kanjurmarg, East and West: what the map shows
Kanjurmarg straddles the Central line: LBS Marg runs through the West, and the city’s landfill and salt-pan wetlands lie to the East. We measured all 13 housing projects on our map (3 West of the railway, 10 East)against the landfill and the wetlands, and against the nearest stations and air monitors. Here is the area as a whole — and what the map can’t tell you.
Page reviewed · Air readings as of 23 Sept, 9 pm
- active MahaRERA projects
- 18
- homes in them
- 6,364
- still unsold, per the promoters
- 1,966
- moved beyond MahaRERA’s common 4 months; 6 by a year or more
- 7 of 18
Projects we cover
Pick a project on the map or from the list. Its card shows what the map already knows; its preview adds the status of every section, and lets you compare two.
Pick a project on the map or from the list to see it here.
What’s being built, per MahaRERA
MahaRERA lists 74 registrations with the 400042 pincode; 30 were updated from January 2025. We read the full page of every one. Each project is listed where the location its promoter gave MahaRERA puts it, checked against the map, or by pincode where there’s no usable location (4 here are filed under another pincode; 7 filed under 400042 are on a neighbouring area’s page). The bar is how far each project’s completion date has moved since it was first registered. Most include 4 months that MahaRERA added to every project due on or after 28 February 2026 (Order 66/2026, August 2026).
100 homes or more · 9
- Runwal AvenueEast · 1,927 units · 583 unsold · 6 registrations4–34 months by wing · last wing due Feb 2029
- Runwal Forests (Towers 9–11)West · 1,047 units · 31 unsold12 months · Jun 2026 → Jun 2027
- Runwal MeadowsEast · 706 units · 523 unsold · 2 registrations4 months, each wing · last wing due Nov 2033
- Runwal BlissEast · 704 units · 355 unsold · 3 registrations4–34 months by wing · last wing due Nov 2029
- Raheja AntaresWest · 485 units · 168 unsold · 2 registrations4 months, each wing · last wing due Mar 2030
- AvanteWest · 383 units · 5 unsold64 months · Dec 2022 → Apr 2028
- Flora380 units · 113 unsold4 months · Mar 2032 → Jul 2032
- Satre Happynest318 units · 76 unsold4 months · Dec 2027 → Apr 2028
- Shraddha PavillionEast · 166 units · 56 unsold4 months · Jan 2027 → May 2027
Smaller buildings · 9
- Goodwill CHS56 units · 6 unsold16 months · May 2025 → Sept 2026
- Bhavani PlazaEast · 43 units · 0 unsold93 months · Dec 2019 → Oct 2027
- Palace Powai35 units · 14 unsold4 months · Sept 2028 → Jan 2029
- Shivsagar CHS26 units · 2 unsold4 months · Dec 2028 → Apr 2029
- Agadh Sagar CHSEast · 26 units · 9 unsoldDue Dec 2028 · no revision on record
- Visawa CHSEast · 22 units · 4 unsold4 months · Dec 2028 → Apr 2029
- Satyam CHSEast · 22 units · 14 unsold4 months · Dec 2030 → Apr 2031
- Ramchandra EnclaveEast · 18 units · 7 unsold4 months · Jul 2027 → Nov 2027
- Shraddha Autumn ParkEast · No unit table on MahaRERA76 months · Dec 2021 → Apr 2028
- Runwal Meadows: Besides sold, booked and unsold: Aster: 183 marked “reservation”.
- Goodwill CHS: Besides sold, booked and unsold: 3 rehab.
- Shraddha Pavillion: Besides sold, booked and unsold: 52 rehab.
- Ramchandra Enclave: Besides sold, booked and unsold: 4 landowner/investor share not for sale.
- Shivsagar CHS: Besides sold, booked and unsold: 14 rehab.
- Palace Powai: Besides sold, booked and unsold: 20 rehab.
- Visawa CHS: Besides sold, booked and unsold: 12 landowner/investor share not for sale.
- Agadh Sagar CHS: Besides sold, booked and unsold: 12 rehab.
- Flora: Besides sold, booked and unsold: 131 rehab, 136 marked “reservation”.
- Satyam CHS: Besides sold, booked and unsold: 8 rehab.
- Raheja Antares: Besides sold, booked and unsold: Tower A: 23 landowner/investor share for sale; Tower B: 31 landowner/investor share for sale.
- Bhavani Plaza: Besides sold, booked and unsold: 19 rehab.
“Unsold” is the promoter’s own count on MahaRERA; booked flats aren’t included in it. Dates are each wing’s proposed completion date. Pincode list fetched 25 Sept 2026; project pages read 28 Sept 2026. A moved date is a fact on record, not a verdict. Read but not listed: Vishnu Bhaskar CHS (“Completed” on MahaRERA).
Around the area
What the map shows for the 13 placed projects together. Which project is how far from what is in each project’s report.
The landfill
4 of 13 projects
within 1 km of its mapped edge. Details
Salt-pan wetland
1 of 13 projects
within 1 km. Details
Former industrial land
1 of 13 projects
on it or within 100 m. Details
Nearest station
Kanjur Marg · ~4–16 min
walk, for 9 projects. Details
Air, one day
AQI 60 · Satisfactory
Khindipada-Bhandup West · IITM, 23 Sept, 9 pm. Details
The distances, stations and air in detail
The landfill
The Kanjurmarg landfill covers about 1.4 km² in its OpenStreetMap outline. Here is how many of the 13 mapped projects sit within each distance of its nearest edge.
| Projects within | Mapped projects |
|---|---|
| 1 km | 4 of 13 |
| 2 km | 13 of 13 |
| 3 km | 13 of 13 |
Straight-line distance from each project’s mapped point to the landfill’s mapped edge. Which projects, how far and in which direction is in each project’s report. Every project’s distance, and the court cases over the site: the Kanjurmarg dumping ground guide.
The salt pans
3 salt-pan wetlands, about 1.0 km² together, are mapped in and around the area. Salt pans are low-lying wetland; how close a project sits matters for drainage and for what may be built there later.
| Projects within | Mapped projects |
|---|---|
| 1 km | 1 of 13 |
| 2 km | 11 of 13 |
| 3 km | 13 of 13 |
Former industrial land
1 mapped project sits on or within 100 m of a former industrial compound in our layers. Old industrial use can leave questions about soil and approvals; a report traces what stood on the site, decade by decade.
Getting to the station
The nearest suburban station for each mapped project, and the range of walks to it.
| Station | Nearest for | Walk, estimated |
|---|---|---|
| Kanjur Marg | 9 projects | ~4–16 min |
| Bhandup | 4 projects | ~11–18 min |
Walks are estimates: straight line × 1.3, at 4.5 km/h. No metro station is open nearby yet; Line 4 on LBS Marg is not open as of Sep 2026.
The air
The three nearest official monitoring stations that reported, measured from Kanjur Marg station.
| Station | Distance | AQI, 24-hour |
|---|---|---|
| Khindipada-Bhandup West · IITM | 4.1 km | 60 · Satisfactory · mostly PM10 |
| Ghatkopar · BMC | 5.0 km | 68 · Satisfactory · mostly PM10 |
| Mulund West · MPCB | 5.3 km | 48 · Good · mostly PM2.5 |
One day’s reading, as of 23 Sept, 9 pm. A single day says little; a report shows a year of daily readings, and what the nearest station doesn’t measure.
What this page can’t tell you
- Flood spots and rainfall: in each report, from the government’s listed flood-prone spots and ten years of daily rainfall for the site’s 5 km grid cell. Heat: coming soon.
- What flats actually registered for, next to what listings ask.
- Why a date moved, the builder’s record, court cases and the occupation certificate.
- Anything OpenStreetMap is missing. It is mapped by volunteers; a project that isn’t on our map isn’t in these counts.
A Catch Report covers all of this for one property, every line sourced, for ₹999. It is research, not legal advice: for title, use a property lawyer.
Buyer guides
- What to check before you pay the token on a Mumbai flat
- How to check if a MahaRERA project’s completion date has moved
- MahaRERA’s 4-month extension (Order 66/2026): is your project covered?
- MahaRERA project search without login: look up any Mumbai project
- Kanjurmarg dumping ground: how far is each project, and what’s in court
- OC and CC full form and meaning: how to check them for a Mumbai flat
- Carpet area vs built-up vs super built-up: what you actually get in Mumbai
- Stamp duty and ready reckoner rate in Mumbai (2026–27): what you’ll pay
- Property card and Index II in Mumbai: how to see them free online
- MahaRERA complaint: how to file one online and track its status
- Stamp duty calculator for Mumbai and Thane (2026): duty and registration fee
- Index II download free: step by step on IGR eSearch (Mumbai and Thane)
- Kalpataru Parkcity, Thane: every MahaRERA registration, possession date and complaint
- Conveyance deed and deemed conveyance in Maharashtra: does your society own its land?
- FSI and TDR meaning: why a Mumbai or Thane builder can add floors, and how to check
- Carpet area calculator: square metres to sq ft, loading and the real rate
- Is the property mortgaged? CERSAI search, and three free checks first
- Property tax in Mumbai and Thane: how to check dues before you buy
- Air quality in Mumbai and Thane by area: a year of readings from every station
Nearby areas
Sources
Landfill, salt-pan, industrial and project outlines, and stations: © OpenStreetMap contributors (ODbL). Air: official monitoring stations, each named with its operator, 24-hour averages. Distances are computed by The Catch. See how we check.