← All projects in Bhandup

Preview · Bhandup West, Mumbai · Coming soon

Advent Neel Residency

Advent Neel Residency’s completion date on MahaRERA is due Dec 2028, with no revision on record. Below: its MahaRERA record and what the map shows. Our full report on it is coming soon.

MahaRERA
1 phase
PM1180002400062

Key numbers

Walk to Nahur station
~26 min
Estimate: straight line × 1.3, at 4.5 km/h
Mapped hazards within 2 km
1 kind
What and how far: in the report
Air quality, 24-hour average
AQI 60
Satisfactory · Khindipada-Bhandup West · IITM, 1.4 km away · 23 Sept, 9 pm

What MahaRERA shows

Read 28 Sept 2026

Advent Neel Residency on the MahaRERA register
RERA no.First dateNowUnitsUnsold
PM1180002400062Dec 2028No revision4613

No complaints on MahaRERA against this registration. 46 units, 13 unsold per the promoter; booked flats aren’t counted as unsold. Besides sold, booked and unsold: 10 rehab. Search the registration number on maharera.maharashtra.gov.in to check it yourself (how to search, how to read the dates).

Ask before you pay

· The current building permit (CC) for your wing, valid today, and the floor it reaches.

In the full report

Each opens in the sample, so you know what you’d get

The Advent Neel Residency report isn’t ready yet.

It will cost ₹999. See a full sample for what it covers.

Requests decide what we research next. One email when it’s ready, nothing else.

Connectivity nearby

Trains

  • Nahur~26 min walk
  • Bhandup~29 min walk

Main roads

  • LBS Marg0.5 km
  • Eastern Express Highway2.3 km

No metro station open nearby yet. Line 4 on LBS Marg is not open as of Sep 2026. Walks are estimates (straight line × 1.3, at 4.5 km/h); road distances are straight line. Rush-hour drive times are coming soon.

Other projects nearby

Straight-line distance

All projects in Bhandup

Check it yourself

Free buyer guides

Compare side by side

Show · Pick a second project on the map

Pick a second project to see its numbers next to Advent Neel Residency’s.